CERC announces draft notification for the sharing of the inter-state transmission charges and losses regulations, 2019

Central Electricity Regulatory Commission recently announced draft notification for the sharing of the inter-state transmission charges and losses regulations, 2019. These regulations will be applicable to all Designated ISTS Customers, Inter-State Transmission Licensees, National Load Despatch Centre (NLDC), Regional Load Despatch Centres (RLDCs), State Load Despatch Centres (SLDCs) and Regional Read more…

By Team REConnect, ago
Amendment

Tamil Nadu Electricity Regulatory Commission announces draft amendment to its RPO Regulation, 2010

Tamil Nadu Electricity Regulatory Commission recently announced a draft amendment to its  (Renewable Energy Purchase Obligations) 2010. The comments & suggestions are expected to be submitted by 21 November 2019. The principal regulations were announced in 2010 with amendments in 2011, 2013, and 2016.  The latest draft amendment is in Read more…

By Team REConnect, ago
Blog

REC Trade Result – October 2019

The October trade witnessed a two and a half year high MCP of Rs 2,400 for solar REC’s on both the exchanges while the demand remained stable as compared to the previous trade session. Solar RECs traded at the forbearance price of Rs 2,400.  Non-Solar: Non-solar RECs traded at the Read more…

By Team REConnect, ago
Amendment

Madhya Pradesh announces 8th amendment of the Co-generation and Generation of electricity from Renewable Energy Sources

Madhya Pradesh Electricity Regulatory Commission recently announced the 8th amendment to the  (COGENERATION AND GENERATION OF ELECTRICITY FROM RENEWABLE SOURCES OF ENERGY) Revision – I, Regulations, 2010. The following are the changes included in the current version. Newly inserted clause 3(ii-a): ‘Captive RE Generation Source’ means a RE power plant set Read more…

By Team REConnect, ago
Blog

MPERC publishes first amendment of Forecasting & Scheduling Regulations for Wind and Solar

The Honourable Madhya Pradesh Electricity Regulatory Commission (‘MPERC’) published its order for the first amendment of Forecasting & Scheduling regulations, and for approving the operational procedures in MP. Executive Summary The key contention of generators and QCAs in MP was that DSM was implemented even before the “Detailed Procedures” were Read more…

By Team REConnect, ago
Blog

Punjab announces the procedure for Forecasting, Scheduling and Deviation Settlement of Solar & Wind Generation

Punjab Electricity Regulatory Commission had recently announced its regulations for  Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation sources, followed by which Punjab State Transmission Corporation Limited (PSTCL) published its procedure on 29th September 2019. The state has a total solar installed capacity of approximately 905 Read more…

By Team REConnect, ago
Blog

Analysis of RERC’s order on the Forecasting & Scheduling Regulations

Rajasthan Electricity Regulatory Commission published an order announcing judgments to the current Forecasting & Scheduling regulations post several petitions filed over issues stated below along with the resolutions: Adjustment of inter-state and intra-state power One of the main issues under consideration was the order in which inter-state and intra-state power Read more…