DERC announces draft guidelines for group and virtual net metering
Delhi Electricity Regulatory Commission (DERC) announced the draft guidelines under the draft guidelines under DERC (Net Metering for Renewable Energy) Regulations, 2014 for implementation of Group Net Metering and Virtual Net Metering Framework under Delhi Solar Policy 2016. The comments
UPERC announces draft rooftop photo voltaic solar regulations 2019
Uttar Pradesh Electricity Regulatory Commission (UPERC) has recently announced the draft regulation for Rooftop Solar Photo Voltaic 2019. The draft regulations once notified by the Gazette will supersede “UPERC (Rooftop Solar PV Grid Interactive Systems Gross / Net Metering) Regulations,
MPUVNL announces new decentralized solar policy and rooftop solar tariff reaches at INR 1.38/kWh
Madhya Pradesh Govt. recently introduced a decentralized solar policy to encourage the development of the decentralized RE projects and applications in the state. The policy allows decentralized RE systems of the following types: Grid-connected RE systems: Category I: On
MERC denies Cleanmax’s plea to use Open Access and Net metering simultaneously
In a petition filed by Cleanmax Enviro Energy Solutions Pvt. Ltd., the organization had sought clarification regarding the net metering arrangements for Open Access consumers under the MERC regulations 2015 from the commission. As a part of the reply to
MNRE’s RENEWABLE ENERGY TARGETS AMBITIOUS AND UNATTAINABLE WITHOUT COOPERATION FROM STATE GOVERNMENTS
As reported by The Hindu the Ministry of New and Renewable Energy (MNRE) has set the targets for solar and wind capacity additions for this year to 12,000 MW and 4,000 MW respectively. This comes as a surprise since the
KERC Determines tariffs and other norms for Solar Rooftop and Small Photovoltaic Power Plants
This Order is applicable to all new grid connected solar rooftop and small solar photo voltaic power plants, entering into Power Purchase Agreement (PPA) and commissioned on or after 2nd May, 2016 and up to 31st March, 2018. Sharing of Clean
Gujarat Solar Power Policy 2015
Gujarat came up with its new solar power policy on 13th August 2015, which would be operative up to March 31, 2020. This new policy intends to facilitate and promote large scale promotion of the solar power generation capacities in
REConnect Newsletter Volume 52 (June 2015) – OPEN ACCESS
Dear Reader, We are please to present OPEN ACCESS - our monthly newsletter that covers important developments in the renewable energy markets. This month's newsletter covers: Detailed analysis of the 5th Amendment to REC regulations proposed by CERC. This amendment will have
MNRE Notifies Year-wise Targets to Achieve the 100GW Solar Capacity
The New and Renewable Energy Ministry (MNRE) has notified a resolution on 6th July, 2015, which defines the Year-wise targets, so as to achieve the 100GW solar Capacity in next 7 years (I.e. by FY 2021-22). The Ministry has stated that
Madhya Pradesh Proposes Policy for Solar Rooftop
The Madhya Pradesh New & Renewable Energy Department (MPNRED) in its latest notification has proposed a policy for Net Metering based Solar Rooftop systems. The policy will come in force from the date of its notification in the state official