Madhya Pradesh Electricity Regulatory Commission (MPERC) came up with its Demand Side Management draft regulations, on 21st September 2015. It’s the State’s first initiative towards practicing a cost effective method of selecting, planning and implementing measures which intend to have an influence on demand side, either directly or indirectly.

  • The draft regulation describes the demand side management objectives, targets and guidelines.
  • The Distribution Licensee of State and shall undertake the load research to identify its target consumer segments and end uses for DSM programmes to build the necessary database.
  • Distribution Licensee shall formulate a perspective DSM plan covering period of the control period, within one year of notification of these regulations.
  • The benchmarks and DSM plans set by the commission will help the state achieve its objectives of:
    • Power shortage mitigation,
    • Seasonal peak reduction, cost effective energy savings,
    • Lowering the cost of electricity,
    • Reduction in emissions of greenhouse gases etc.

The commission invited comments and suggestions on the same till 29th September, 2015.