Custom html block

Blog

MOP DETERMINES GUIDELINES FOR FOR COMPETITIVE BIDDING FOR POWER PROCUREMENT FROM SOLAR PV PROJECTS

The Ministry of Power (MoP) has released the guidelines for procurement of power from grid connected solar PV power projects. The guidelines are applicable to solar PV projects of size 5 MW and above. The purpose of these guidelines is to provide a direction for proper electricity procurement by distribution licensees and to protect the interest of the consumers. Also to make this process transparent and uniform.

 

Following are the salient features of the guidelines:

 

  • The appropriate Commission shall be CERC only in case if the distribution licensee is located in more than one state

  • SERCs will be the appropriate commission in case if there is a single distribution licensee.

  • The conditions to be met by the procurer are as follows:

  • The bid document should be prepared in accordance with the guidelines of MoP and the Standard Bidding Documents.

  • Clearances need to be procured from the end procurer, the agency developing the solar park.

  • Procurer has to specify where the project has been set up.

  • The bid structure shall be as follows:

  • The bids will be designed in terms of packages where the minimum will be 50 MW and the bids may be in energy quantity or power capacity terms.

  • The procurer may opt for either ‘tariff as bidding parameter’ or ‘VGF as the bidding parameter’.

  • The PPA period should not be less than 25 years and it can be in terms of energy or power. Repowering will be allowed from time to time for the duration of the PPA.

  • In case of default by the power generator, it shall be liable to pay the solar power generator as written in the PPA. Also, in such a case, the lender shall be allowed to exercise their right to substitution as per the substitution agreement provided in the PPA.

  • In case if the procurer is at default, it shall give its part of the PPA to a third party in the given time. In case if that is not done, the solar generators have a choice to terminate the PPA.

  • Once the procurer calls for bids, a single stage bidding process shall be followed. The procurer can also chose if an e-reverse auction shall be held. It is the responsibility of the procurer to give the details of the bidding process in case of a Solar park specific project.

  • For bid submission and evaluation, the bidders may form a consortium and chose a leader who shall be the focal point of contact. Also, for evaluation of bids, the procurer may form a committee. The technical and price bids shall be submitted separately along with a bid guarantee. Minimum number of bidders should be two and a proper methodology shall be followed for bid evaluation.

  • A 30 day period shall be given for bid submission from the issuance of RfS document. A table containing the time table for bid process is given in the guidelines attached below.

  • Bank guarantees such as earnest money deposit and performance bank guarantee need to be submitted.

The guidelines can be accessed here.